search-banner

Search Results

Showing results for ayant anti ayant ayant ayant ayant ayant skype and787

Cleaning of Pipelines for Abandonment – Final Report FR

[…] C du présent rapport. Nous traitons ci-après plus en détail des contaminants du gaz naturel. 2 Cette figure vient de l’AITF et repose sur une recherche interne ayant porté sur des boues déposées dans des canalisations de transport de pétrole brut; elle est reproduite ici avec la permission de l’AITF. Rapport final PARSC 004 […]

Stationary Engine Air Emissions Research – Final Report

Stationary Engine Air Emissions Research – Final Report

Improving salt removal from wetlands using the anti-caking agent potassium ferrocyanide trihydride.

Project Title: Improving salt removal from wetlands using the anti-caking agent potassium ferrocyanide trihydride. Project Lead: Mr. Mark Beasse Email: [email protected] Project Lead Organization / Company Information: Organization: LMK Environmental Consulting Department: Assessment, Remediation, and Management of Contaminated Land Phone Number: 403 966-3458 Website/URL: http://lmkconsulting.ca Mailing Address: [email protected] Project Cost Summary for 2022: Total […]

Emissions Reductions and Energy Efficiency in Crude Bitumen and Heavy Oil Project – Final Report FR

[…] poursuivre le contrôle des souffleurs compresseurs en place et possiblement, de trouver d’autres sites qui en profiteraient mieux. Husky Energy a fait une démonstration sur le terrain ayant pour but d’évaluer la possibilité de générer des contreparties de la fixation du carbone en mettant en place la couverture flottante Hexa-Cover® de l’entreprise Greatario sur […]

AES Phase 1 Appendices

[…] refueling outage. Refueling outages typically take place at two year intervals. Since all nuclear power plants must shut down periodically for inspection and maintenance, it is not anticipated that on-power fueling capability will significantly increase PBMR plant availability. However, it does complicate plant design and operation. © SNC-Lavalin Nuclear Inc. PROPRIETARY DRAFT – For […]

Characterization and toxicological assessment of post combustion air emissions from hydraulically fractured oil and gas wells in the Cardium, Montney, and Duverney Formations in Alberta.

[…] and positive public perception of unbiased data and conclusions as research is conducted by University researchers in collaboration with regulatory agencies, communities and and industry. – Qu antitative data set to guide risk- based policy and regulatory decisions to drive monitoring and risk management and mitigation practices as required. – Cutting edge foundational scientific […]

Proppant Surface Treatment and Well Stimulation – Final Report FR

[…] surface du sable et au lieu leur permet de s’écouler plus rapidement. Dans la technologie TSAS, l’agent de soutènement ordinaire, le sable, est remplacé par un sable ayant subi un traitement et le programme de complétion demeure, par ailleurs, inchangé. D a n s l a t e c h no l o gi […]

Cold Heavy Oil Production with Sand (CHOPS) Methods for Reduction of Methane Venting – Final Report

[…] treatment lagoons but have been found to be useful for a similar application in oil and gas, particularly CHOPS tanks. The Hexa-Cover® tiles have been designed with anti-static material for oilfield applications. The tiles are dumped into a tank through the thief hatch or other opening and can be installed whether there is liquid […]

Evaluation of Reclamation Practices on Forested Upland and Peatland Wellsites – Full Report

[…] Region – A Path Forward MEETING AGENDA Location: InnoTech Alberta, 250 Karl Clark Road, Edmonton Date: December 11, 2019 (1:00 to 4:30 pm) Participation Options: In Person; Skype for Business The purpose of the meeting is to facilitate a productive discussion related to change in land use requests. The objective is to inform a […]

Evaluation of Reclamation Practices on Forested Upland and Peatland Wellsites – Appendices

[…] Region – A Path Forward MEETING AGENDA Location: InnoTech Alberta, 250 Karl Clark Road, Edmonton Date: December 11, 2019 (1:00 to 4:30 pm) Participation Options: In Person; Skype for Business The purpose of the meeting is to facilitate a productive discussion related to change in land use requests. The objective is to inform a […]