Combustion Solutions Inc.
September 2016
Executive Summary
Combustion Solutions Inc. researched and bench scale tested a high pressure submerged burner and then designed and fabricated a transportable 5 MM Btu/hour Submerged Combustion Vaporizer process package that was intended for field testing on a Husky Energy CHOPS (Cold Heavy Oil Production with Sand) well near to Lloydminster, SK.
In the process of undertaking the scope of work, it was recognized that it would be beneficial to expand the project scope in three phases:
1) Design and Manufacture a transportable SCV including add-on of annulus cooling process skid
2) Installation of the SCV at a well site
3) Testing of the SCV process including additional project scope.