Dry Gas Seal to Utility Gas Booster Compressor Skid

TC Energy – NOVA Gas Transmission Ltd.

March 31, 2023

Executive Summary

The scope of the pilot project is to procure and install a Booster Compressor equipment package skid that will capture and recompress the DGS Primary Vent gas and inject it into the onsite, lower pressure, Utility Gas system. The Utility Gas system supplies Fuel Gas for the existing on-site primary power generator and boilers. This pilot project was still underway when this report was written and will be completed in December 2023. The Booster Compressor Skid is being installed at a TC Energy Compressor Station in Northern Alberta.

 

Final Report