Executive Summary
The Pipeline Abandonment Research Steering Committee (PARSC) a working body within the Petroleum Technology Alliance of Canada (PTAC) commissioned Jacobs and Plex Projects Inc. to undertake a subsurface assessment on a segment of NGTL Peace River Mainline (PRML), abandoned between 1972 and 1979. The project objectives are to collect, analyze, and compare the data collected in situ, against the calculated models.
The field assessment of the pipeline was completed near the Dryden Creek compressor station on July 4 and 5, 2019 and included the following activities: